ZPE_Logo
  
Search        
  Create an account Home  ·  Topics  ·  Downloads  ·  Your Account  ·  Submit News  ·  Top 10  
Mission Statement

Modules
· Home
· Forum
· LATEST COMMENTS
· Special Sections
· SUPPORT ZPEnergy
· Advertising
· AvantGo
· Books
· Downloads
· Events
· Feedback
· Link to us
· Private Messages
· Search
· Stories Archive
· Submit News
· Surveys
· Top 10
· Topics
· Web Links
· Your Account

Who's Online
There are currently, 394 guest(s) and 0 member(s) that are online.

You are Anonymous user. You can register for free by clicking here

Events
  • (June 24, 2026 - June 28, 2026) 2026 ESTC CONFERENCE

  • Hot Links
    Aetherometry

    American Antigravity

    Closeminded Science

    EarthTech

    ECW E-Cat World

    Innoplaza

    Integrity Research Institute

    New Energy Movement

    New Energy Times

    Panacea-BOCAF

    RexResearch

    Science Hobbyist

    T. Bearden Mirror Site

    USPTO

    Want to Know

    Other Info-Sources
    NE News Sites
    AER_Network
    E-Cat World
    NexusNewsfeed ZPE
    NE Discussion Groups
    Energetic Forum
    EMediaPress
    Energy Science Forum
    Free_Energy FB Group
    The KeelyNet Blog
    OverUnity Research
    Sarfatti_Physics
    Tesla Science Foundation (FB)
    Vortex (old Interact)
    Magazine Sites
    Electrifying Times (FB)
    ExtraOrdinary Technology
    IE Magazine
    New Energy Times

    Interesting Links

    Click Here for the DISCLOSURE PROJECT
    SciTech Daily Review
    NEXUS Magazine

    The world's first zero-point energy device moves into production
    Posted on Tuesday, December 02, 2025 @ 19:41:51 UTC by vlad

    Devices
    Via newfireenergy.substack.com: The world's first zero-point energy device moves into production, with deliveries beginning December 2025. A solid-state LENR system finally crosses the threshold into industrial deployment, opening the door to decentralized power. New Fire Energy/ Dec 2, 2025 (Left: Concept visualization of the zero-point field, not a Leonardo photo.)

    Andrea Rossi’s December Report just dropped,

    It marks the most important update in the entire history of this project. After years of prototypes, testing cycles, engineering refinements, and endless debate, we now have a clear statement directly from the source that the first industrialized E-Cat NGU modules are being built and deliveries are scheduled to begin in December.

    Here is Rossi’s December Report in full, exactly as released:

    Dear Followers,
    During the month of November many tests have been made with the prototypes of the Ecat and the first lot of industrialized modules is under construction.


    It is likely that the deliveries will start in December, starting with industrial applications.
    We are very pleased with the level of reliability we have reached. Our prototypes have worked 24 hours per day for months.
    I am already working on the next generation as the chief scientist, because the tests on this first wave have suggested improvements we can make for the next series.
    Warm Regards,
    Andrea Rossi
    CEO Leonardo Corporation"

    (The December E-Cat report has been published on the Leonardo Corporation X account.
    https://x.com/LeonardoCorpor3/status/1995450935233933481)

    With this statement, the NGU moves from “anticipated technology” to actively manufactured hardware.

    Why This Particular Update Matters

    There have been many announcements over the years, but this one stands apart because of what it signals. This is no longer about prototypes on the bench or isolated lab demonstrations. This is about a device crossing the threshold into real-world industrial deployment. That line, moving from development into production, is where technologies stop being ideas and start becoming infrastructure.

    For anyone following LENR, ZPE-class systems, or the broader decentralized-energy movement, this is the moment everything becomes real.

    The first industrial deployments are the proof point

    Industrial customers don’t care about hype. They care about reliability, uptime, and performance.
    Rossi’s note that prototypes have run 24/7 for months sets the stage for the first real-world validation, where the stakes are hard numbers, not opinions.

    The entire LENR ecosystem now accelerates

    ENG8, Clean Planet, Brillouin, Aureon, and BLP all move onto a faster timeline the moment one company ships.
    A commercial release is the rising tide. It forces verification, comparison, competition, and external scrutiny on a new level.

    One player’s move often advances the entire field.

    Decentralized power becomes credible

    Before this update, “a power source the size of a module running without fuel” sat in the category of possibility.
    Now it enters the category of deployment.

    Consumer applications won’t come tomorrow, but they will enter a realistic timeline:
    manufacture → adopt → scale → adapt → mass-market.

    AI, robotics, and automation unlock their next stage

    Every engineer in those fields knows the truth: energy is the bottleneck.
    A reliable, solid-state power source removes that bottleneck and opens the door to a wave of autonomous robotics, off-grid AI systems, and distributed computing networks.

    Geopolitics will bend around this shift

    When energy becomes local, clean, and modular, the leverage of oil and centralized grids weakens.
    Nations adjust.
    Infrastructure planning changes.
    Energy security takes on a new meaning.

    This is how the world quietly opens into a new chapter.

    The Weight of This Moment

    What stands out in Rossi’s update isn’t the technical content; it’s the tone.
    There is no hesitation. No conditional language.
    Just a factual statement:

      *  prototypes ran for months around the clock

      * Industrial modules are being built

      *  deliveries begin in December

      *  and next-generation design is already underway

    This is how turning points tend to appear in real time.
    Not with fanfare, but with a matter-of-fact announcement that signals everything downstream has changed.

    And the truth is simple:
    History will mark this as the moment the future stopped knocking and walked straight in.

    Where We Go from Here

    Most of the world won’t recognize the magnitude of this release yet.
    That recognition comes later, after industrial users confirm performance, after competitors accelerate, and after the technology begins to ripple out of its niche and into the mainstream.

    But for those watching closely, this is the inflection point.

    The NGU is entering production.
    Deliveries begin within weeks.
    And the next generation is already on the drawing board.

    The shift has started.

    ~New Fire Energy Inc.
    Disclaimer:

    This publication is for research and education only. It is not investment, financial, legal, engineering, or business advice, and it is not an offer to sell or a solicitation to buy any security or product.

    New Fire Energy Inc. is independent and not affiliated with Leonardo Corporation, Andrea Rossi, or “E-Cat/The New Fire.” All quotations attributed to Andrea Rossi are taken from his public statements and blogs as cited by the community; accuracy and completeness are not guaranteed.

    Any diagrams, photos, or integration concepts shown here (including containerized substation concepts) are publisher concepts for illustration only. They are not official designs, specifications, or endorsements by Leonardo Corporation or its partners. Real-world deployment would require utility approval, site-specific engineering, safety reviews, certifications, and regulatory compliance.

    This article includes forward-looking statements and scenario analyses that involve risks and uncertainties. Actual outcomes may differ materially due to technical, regulatory, commercial, and operational factors.

    Readers should perform their own due diligence and consult qualified professionals before making decisions based on this content. All trademarks belong to their respective owners.


     
    Login
    Nickname

    Password

    Security Code: Security Code
    Type Security Code

    Don't have an account yet? You can create one. As a registered user you have some advantages like theme manager, comments configuration and post comments with your name.

    Related Links
    · More about Devices
    · News by vlad


    Most read story about Devices:
    Overunity magnet motor released !


    Article Rating
    Average Score: 3
    Votes: 2


    Please take a second and vote for this article:

    Excellent
    Very Good
    Good
    Regular
    Bad


    Options

     Printer Friendly Printer Friendly


    "The world's first zero-point energy device moves into production" | Login/Create an Account | 3 comments | Search Discussion
    The comments are owned by the poster. We aren't responsible for their content.

    No Comments Allowed for Anonymous, please register

    E-Cat Deliveries to Start Jan 20, 2026 (Score: 1)
    by vlad on Wednesday, December 10, 2025 @ 20:38:04 UTC
    (User Info | Send a Message) http://www.zpenergy.com
    From e-catworld.com: Frank Acland writes: I received a message from Andrea Rossi today informing me that the deliveries of E-Cat will start on January 20th, 2026

    I responded to him, asking if this was for the industrial units, or for the preorders that people have placed. His response was:

    “Only industrials so far”

    So there we have it, the prediction of deliveries beginning in 2025 was not quite accurate, but 20 days into next year is close enough for me.

    The obvious question that I am sure people will be asking now, is when will we get confirmation that this has happened, from someone other than Rossi. He has said that these first units will be put to use supplying electricity to the grid. He said that the grid provider is aware of what is going on, so perhaps they will share that information at some point.



    ZPE Goes Live, Production Confirmed, Deliveries Began December 2025! (Score: 1)
    by vlad on Friday, January 02, 2026 @ 20:13:52 UTC
    (User Info | Send a Message) http://www.zpenergy.com
    From NewFieEnergy substack newsletter: Production Confirmed. Deliveries Underway. Here’s What Comes Next/ From patent to power: deliveries began in December 2025, initial installs target substations

    Industrial deliveries are underway

    Rossi states the first E-Cat NGU units shipped in December 2025, with a megawatt-class site in acceptance testing. The near-term plan is industrial /substation first, to prove verified kWh on the grid, with broader rollout to individual orders managed by the licensee. A global presentation is hinted, an ecat.com [ecat.com] refresh is “yes,” and sections of the MW assembly have already been tested. After years of talk, we’re finally looking at equipment in the field and meters to read.

    Status Update: Jan 1–2, 2026

    Continuing from the Dec 9–19 briefing. All items below are direct Q&A excerpts from Andrea Rossi’s blog, with dates and attributions. (Q and A are exact quotes.)...

    Read the whole article here: https://substack.com/home/post/p-183249447




     

    All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest © 2002-2016 by ZPEnergy. Disclaimer: No content, on or affiliated with ZPEnergy should be construed as or relied upon as investment advice. While every effort is made to ensure that the information contained on ZPEnergy is correct, the operators of ZPEnergy make no warranties as to its accuracy. In all respects visitors should seek independent verification and investment advice.
    Keywords: ZPE, ZPF, Zero Point Energy, Zero Point Fluctuations, ZPEnergy, New Energy Technology, Small Scale Implementation, Energy Storage Technology, Space-Energy, Space Energy, Natural Potential, Investors, Investing, Vacuum Energy, Electromagnetic, Over Unity, Overunity, Over-Unity, Free Energy, Free-Energy, Ether, Aether, Cold Fusion, Cold-Fusion, Fuel Cell, Quantum Mechanics, Van der Waals, Casimir, Advanced Physics, Vibrations, Advanced Energy Conversion, Rotational Magnetics, Vortex Mechanics, Rotational Electromagnetics, Earth Electromagnetics, Gyroscopes, Gyroscopic Effects

    PHP-Nuke Copyright © 2005 by Francisco Burzi. This is free software, and you may redistribute it under the GPL. PHP-Nuke comes with absolutely no warranty, for details, see the license.