ZPE_Logo
  
Search        
  Create an account Home  ·  Topics  ·  Downloads  ·  Your Account  ·  Submit News  ·  Top 10  
Mission Statement

Modules
· Home
· Forum
· LATEST COMMENTS
· Special Sections
· SUPPORT ZPEnergy
· Advertising
· AvantGo
· Books
· Downloads
· Events
· Feedback
· Link to us
· Private Messages
· Search
· Stories Archive
· Submit News
· Surveys
· Top 10
· Topics
· Web Links
· Your Account

Who's Online
There are currently, 667 guest(s) and 0 member(s) that are online.

You are Anonymous user. You can register for free by clicking here

Events
  • (June 24, 2026 - June 28, 2026) 2026 ESTC CONFERENCE

  • Hot Links
    Aetherometry

    American Antigravity

    Closeminded Science

    EarthTech

    ECW E-Cat World

    Innoplaza

    Integrity Research Institute

    New Energy Movement

    New Energy Times

    Panacea-BOCAF

    RexResearch

    Science Hobbyist

    T. Bearden Mirror Site

    USPTO

    Want to Know

    Other Info-Sources
    NE News Sites
    AER_Network
    E-Cat World
    NexusNewsfeed ZPE
    NE Discussion Groups
    Energetic Forum
    EMediaPress
    Energy Science Forum
    Free_Energy FB Group
    The KeelyNet Blog
    OverUnity Research
    Sarfatti_Physics
    Tesla Science Foundation (FB)
    Vortex (old Interact)
    Magazine Sites
    Electrifying Times (FB)
    ExtraOrdinary Technology
    IE Magazine
    New Energy Times

    Interesting Links

    Click Here for the DISCLOSURE PROJECT
    SciTech Daily Review
    NEXUS Magazine

    The comments are owned by the poster. We aren't responsible for their content.

    No Comments Allowed for Anonymous, please register

    Re: E-Cat Deliveries to Start Jan 20, 2026 (Score: 1)
    by vlad on Wednesday, December 10, 2025 @ 20:40:52 UTC
    (User Info | Send a Message) http://www.zpenergy.com
    Good comment by Axil Axil to the above post: Will this 1/20/2026 delivery date mark the beginning of a beta testing phase where a limited fixed number of NGU prototype units perform over a definite limited time period, or is this a case where the number of NGU increases with time to produce added power to the grid that increases with time.

    1- If the case is a beta trial, how long is this trial to last.?
    2- If If the case is a beta trial, would that impact the decision to release retail units to the market?
    3- If this is a commencement of a production phase, how will power generation on the grid from NGU units ramp over time.

    Based on typical industry practices for the introduction of new power generation technology, here are general type answers to these type questions:

    Beta Trial vs. Production: For a novel or a first-of-its-kind generator like the one described, it would likely undergo a beta testing or pilot phase first. For example, National Grid Ventures is installing a first-of-its-kind hydrogen-fueled generator that will undergo a 12-month testing period. This phase involves a limited number of units undergoing rigorous testing to prove viability, performance, and safety before a full commercial release.

    Trial Duration: Beta trials for new, grid-connected power technology can vary greatly but often last for a significant, defined period, such as 12 months or longer, to test performance under various seasonal and operational conditions.

    Impact on Retail Release: A successful beta trial is typically a prerequisite for a full commercial/retail release. The results of the trial (performance data, safety compliance, reliability) directly influence the decision to proceed with mass production and market release.

    Power Generation Ramp-Up (if production): If a production phase commences, power generation on the grid would ramp up gradually as more units are manufactured, installed, and connected over time. The ramp-up schedule would depend entirely on manufacturing capacity, regulatory approvals, and project deployment logistics.

        2025-12-10 03:19 Andrea Rossi

        Axil:
        Thank you for your insight and information.
        It is not a Beta trial.
        Warm Regards,
        A.R.


    | Parent

     

    All logos and trademarks in this site are property of their respective owner. The comments are property of their posters, all the rest © 2002-2016 by ZPEnergy. Disclaimer: No content, on or affiliated with ZPEnergy should be construed as or relied upon as investment advice. While every effort is made to ensure that the information contained on ZPEnergy is correct, the operators of ZPEnergy make no warranties as to its accuracy. In all respects visitors should seek independent verification and investment advice.
    Keywords: ZPE, ZPF, Zero Point Energy, Zero Point Fluctuations, ZPEnergy, New Energy Technology, Small Scale Implementation, Energy Storage Technology, Space-Energy, Space Energy, Natural Potential, Investors, Investing, Vacuum Energy, Electromagnetic, Over Unity, Overunity, Over-Unity, Free Energy, Free-Energy, Ether, Aether, Cold Fusion, Cold-Fusion, Fuel Cell, Quantum Mechanics, Van der Waals, Casimir, Advanced Physics, Vibrations, Advanced Energy Conversion, Rotational Magnetics, Vortex Mechanics, Rotational Electromagnetics, Earth Electromagnetics, Gyroscopes, Gyroscopic Effects

    PHP-Nuke Copyright © 2005 by Francisco Burzi. This is free software, and you may redistribute it under the GPL. PHP-Nuke comes with absolutely no warranty, for details, see the license.